Three farmers repowered each an 80kw wind turbine into a 900kW Direct Wind. Local regulations limited the hub height to 35m, which required special tower size for the project. Installation and maintanance of the former and the new wind turbines are
executed by the Wind Factory group. The annual energy production is estimated at 2000 MWh per turbine.
| System |
grid-connected |
| Capacity |
3x900kW |
| Construction |
35m tube tower |
| Year of construction |
2009 |
| Client |
Agribusiness |
| Country / region |
Netherlands / Friesland |
Back to projects
|
|
|
|
|